OpenBCM V1.13-36-g8006 (Linux)

Packet Radio Mailbox

DB0FFL

[Box DB0FFL]

 Login: GAST





  
LU9DCE > WXSAT    31.08.17 07:06l 86 Lines 4393 Bytes #999 (0) @ WW
BID : 17076_LU9DCE
Read: GAST
Subj: NOAA DGD 31 ago 2017
Path: DB0FFL<OE2XZR<OE5XBR<OE1XAB<HG8LXL<N0KFQ<NS2B<N9PMO<VE3UIL<LU9DCE
Sent: 170831/0401Z @:LU9DCE.TOR.BA.ARG.SOAM #:17076 [TORTUGUITAS] $:17076_LU9DC
From: LU9DCE@LU9DCE.TOR.BA.ARG.SOAM
To  : WXSAT@WW

:Product: Daily Geomagnetic Data          DGD.txt
:Issued: 0330 UT 31 Aug 2017
#
#  Prepared by the U.S. Dept. of Commerce, NOAA, Space Weather Prediction Center
#  Please send comment and suggestions to SWPC.Webmaster@noaa.gov
#
#               Last 30 Days Daily Geomagnetic Data
#
#
#                Middle Latitude        High Latitude            Estimated
#              - Fredericksburg -     ---- College ----      --- Planetary ---
#  Date        A     K-indices        A     K-indices        A     K-indices
2017 08 02     8  1 1 1 2 4 2 2 1     5  1 1 0 0 3 3 0 0     5  1 1 1 1 2 2 1 1
2017 08 03    11  1 1 1 2 3 3 3 4     6  0 0 0 0 1 4 2 2    12  1 1 1 1 2 4 4 4
2017 08 04    19  2 4 4 3 4 3 3 3    39  1 3 6 5 6 5 4 2    23  3 4 4 4 4 4 3 3
2017 08 05    17  3 4 3 2 4 3 3 3    35  3 4 6 4 5 5 4 2    16  3 4 3 2 3 3 3 3
2017 08 06    13  3 3 2 4 3 1 3 2    23  3 3 4 6 4 2 2 2    13  3 3 3 4 2 1 2 2
2017 08 07     6  1 2 2 3 2 1 1 1     7  1 1 2 4 3 1 0 0     5  1 2 2 2 2 1 0 1
2017 08 08     5  0 1 0 2 3 2 2 1     5  1 0 1 1 1 2 1 3     5  1 1 1 1 1 2 2 1
2017 08 09     5  0 1 2 1 2 1 2 2     4  1 0 1 2 3 1 1 0     5  1 1 2 1 1 1 1 2
2017 08 10     7  0 1 1 2 4 2 2 1     4  0 2 1 3 1 1 0 0     5  1 1 2 2 2 1 0 2
2017 08 11     7  1 2 2 1 2 2 3 2     5  1 2 1 2 1 2 2 1     7  2 2 1 1 1 2 3 2
2017 08 12    12  3 3 2 2 3 1 3 3     9  3 3 3 1 2 1 2 2    11  3 3 2 2 2 1 3 3
2017 08 13     9  2 3 2 2 2 3 2 1     7  2 2 3 2 2 1 1 1     7  2 2 2 2 2 2 2 2
2017 08 14     5  2 1 0 2 2 1 1 2     4  2 1 0 1 2 0 1 2     5  2 1 1 1 2 1 1 2
2017 08 15     3  1 1 0 1 2 1 1 1     2  1 1 0 0 0 0 1 1     4  1 1 1 1 1 0 1 1
2017 08 16     5  2 1 1 2 2 1 1 2     5  1 1 2 1 2 1 1 2     6  2 1 1 2 1 1 1 2
2017 08 17    20  2 2 5 4 4 3 3 3    59  3 2 6 7 7 5 4 3    29  3 2 5 5 5 3 4 4
2017 08 18    20  5 3 2 3 4 3 4 2    40  3 3 4 5 6 5 6 2    21  4 3 2 3 4 3 5 3
2017 08 19    23  4 4 4 3 3 4 3 4    57  5 4 7 6 6 5 3 3    31  5 4 5 4 4 5 3 4
2017 08 20    21  4 5 3 4 3 3 2 3    32  4 5 6 5 4 3 2 2    22  5 5 3 3 2 3 3 3
2017 08 21    13  2 3 3 4 3 1 2 3    16  3 2 5 4 3 1 2 2    11  3 2 3 3 2 1 2 3
2017 08 22    16  5 4 3 2 3 1 2 2    37  6 5 5 5 5 3 1 2    23  6 5 3 2 3 2 2 3
2017 08 23    17  3 4 3 3 4 3 3 2    72  3 4 5 5 7 8 5 2    25  3 4 4 3 5 4 5 3
2017 08 24    16  4 4 4 3 3 2 1 1    38  2 5 6 6 6 2 0 0    11  3 3 3 3 3 2 1 1
2017 08 25     7  1 2 2 2 3 2 1 1     6  1 1 1 3 3 1 1 1     5  1 1 2 2 2 1 1 2
2017 08 26     5  1 1 2 1 2 2 2 1     2  0 1 1 0 1 2 1 0     5  1 1 2 1 1 2 1 1
2017 08 27     6  2 1 0 2 2 2 2 2    14  2 1 0 4 2 5 3 2    10  3 1 1 3 2 3 3 3
2017 08 28     3  1 1 0 2 1 1 1 0     6  2 1 1 3 3 1 0 0     4  1 1 1 1 1 1 0 1
2017 08 29    10  1 2 2 1 2 2 4 3     6  1 1 2 0 3 1 3 1    10  1 2 2 1 1 2 4 3
2017 08 30     5  2 2 2 2 2 0 1 0     4  1 1 3 2 1 0 0 0     5  2 2 2 1 1 0 0 0
2017 08 31    -1  2-1-1-1-1-1-1-1    -1  2-1-1-1-1-1-1-1     4  2-1-1-1-1-1-1-1

=============================================================
What they say:				What they mean:

A major technological breakthrough...	Back to the drawing
board.	Developed after years of research	Discovered
by pure accident.  Project behind original schedule due
We're working on something else.
	to unforeseen difficulties
Designs are within allowable limits	We made it,
stretching a point or two.  Customer satisfaction is
believed       So far behind schedule that they'll be
	assured					grateful
	for anything at all.
Close project coordination		We're gonna spread
the blame, campers!  Test results were extremely gratifying
It works, and boy, were we surprised!  The design will be
finalized...	     We haven't started yet, but we've got
						to say
						something.
The entire concept has been rejected	The guy who
designed it quit.  We're moving forward with a fresh
We hired three new guys, and they're
	approach				kicking
	it around.
A number of different approaches...	We don't know
where we're going, but
						we're
						moving.
Preliminary operational tests are	Blew up when we
turned it on.
	inconclusive
Modifications are underway		We're starting
over.
=============================================================
##    Eduardo Castillo - Power by Linux - lu9dce@gmx.com   ##
##     BBS TELNET LU9DCE.DYNU.COM 6300 - NODE PORT 3694    ##
=============================================================




Lese vorherige Mail | Lese naechste Mail


 19.09.2026 18:26:22lZurueck Nach oben