| |
HP2DFA > AMSAT 02.10.26 09:34l 52 Lines 2818 Bytes #999 (0) @ WW
BID : 2605_HP2DFA
Read: OE5RCO GAST
Subj: OPERATIONAL CHANGE ON AO-73 (FUNCUBE-1) SATELLITE
Path: DB0FFL<OE2XZR<OE6XPE<DB0RKB<DK0WUE<PD0LPM<VE3CGR<KB5YZB<W0ARP<PY2BIL<
HP2DFA
Sent: 261002/0604Z 2605@HP2DFA.#COL.PAN.CEAM BPQ6.0.24
================================================================================
SATELLITE INFORMATION BULLETIN
AMSAT-UK / AO-73 (FUNcube-1) Satellite Update
================================================================================
Edition: Satellite Operations & Telemetry Date: October 02, 2026
--------------------------------------------------------------------------------
OPERATIONAL CHANGE ON AO-73 (FUNCUBE-1) SATELLITE
* Operational Mode Switch (World Space Week)
Following nearly 1 year of continuous operation of the U/V transponder, the
AO-73 / FUNcube-1 satellite will be switched to transmitting higher power
telemetry starting at approximately 14:30 UTC on Sunday, October 4th.
* Battery & Electrical Power System Health Assessment
The mode change coincides with World Space Week. With current eclipse periods
experienced by AO-73 being quite short (only 20 minutes per orbit without
sunlight), the AMSAT-UK FUNcube team will assess the state of the battery
and electrical power system without significant risk to the satellite.
* Mission Timeline & Resumption of Transponder Mode
Launched in November 2013, AO-73 is approaching 13 years of successful
operations in orbit. Normal transponder operation will resume on Monday,
October 12th.
* Source Information
David G0MRF (for AMSAT-UK) via AMSAT-BB.
--------------------------------------------------------------------------------
MATRIX SUMMARY OF PARAMETERS & SCHEDULE
--------------------------------------------------------------------------------
---------------------- ----------------------- -------------------------------
| SATELLITE / ENTITY | STATUS CHANGE | DATES & TIMING (UTC) |
---------------------- ----------------------- -------------------------------
| AO-73 (FUNcube-1) | High Power Telemetry | Sunday, Oct 04 - 14:30 UTC |
| AMSAT-UK | Battery Assessment | During World Space Week |
| AO-73 (FUNcube-1) | Transponder Resumed | Monday, October 12 |
---------------------- ----------------------- -------------------------------
--------------------------------------------------------------------------------
RECOMMENDATIONS FOR SATELLITE TRACKING & GROUND STATIONS
--------------------------------------------------------------------------------
Operators and tracking stations across the network are encouraged to adjust
decoders and telemetry ground tools to capture telemetry data during the
scheduled testing window.
================================================================================
MAIL: HP2DFA@GMAIL.COM / HP2DFA-5@BPQ32
73 DE HP2DFA-5 / BPQ32 NODE PANAMA
================================================================================
Lese vorherige Mail | Lese naechste Mail
| |